188149
From Customer Business Rules
(Difference between revisions)
Line 4: | Line 4: | ||
<font size ="3"><b> | <font size ="3"><b> | ||
<br><br><br> | <br><br><br> | ||
- | ♦ On Customer's POs, the <u>Require Date</u> represents the SHIP DATE needed. If there is a firm IH date, it will be noted under the <u>IH Date</u> area on the PO.<br> | + | ♦ On Customer's POs, the <u>Require Date</u> represents the SHIP DATE needed. If there is a firm IH date, it will be noted under the <u>IH Date</u> area on the PO.<br><br> |
+ | ♦ No-Charge E-mail Proofs<br> | ||
</b> | </b> | ||
</font> | </font> |
Revision as of 17:36, 9 February 2017
☉ Spectrum Resources Inc ☉
♦ On Customer's POs, the Require Date represents the SHIP DATE needed. If there is a firm IH date, it will be noted under the IH Date area on the PO.
♦ No-Charge E-mail Proofs
Inside Rep: Adam Peffer
Follow-Up Rep (for Entry Questions): Brad Whitney
Outside Rep: Craig Gengler